I. CH MOTOR - Brushless DC Motor D1235(123MM)
Specifications:
-Rated Power: 1500-2200W
-Rated Voltage: 220-300VDC
-Current: 6.0-12A
-Rated Speed: 3500-6000RPM
-Rated Torque: 240-700N. Cm
-Peak Torque: 400-1200N. Cm
-Shaft Diameter: 19mm
-Pole No: 4, 8
Drawing:
Specification:
MODEL |
Voltage |
Rated Power |
Current |
Rated Speed |
Rated Torque |
Peak Torque. |
Shaft Dia. |
Length L1 |
Poles |
V |
W |
A |
rpm |
N.cm |
N.cm |
mm |
mm |
|
D1235-41060 |
300 |
1500 |
6.0 |
3500 |
410 |
800 |
19 |
202 |
8 |
D1235-24060 |
300 |
1500 |
6.0 |
6000 |
240 |
400 |
19 |
202 |
8 |
D1235-77092 |
300 |
2200 |
9.2 |
3500 |
700 |
1200 |
19 |
202 |
8 |
D1235-420120 |
220 |
2200 |
12.0 |
5000 |
420 |
800 |
19 |
202 |
4 |
D1235-35092 |
300 |
2200 |
9.2 |
6000 |
350 |
600 |
19 |
202 |
4 |
*Note: We can customize the special speed, Voltage, Assembled size.
High speed at 4 poles (Conventional). Low speed at 8 poles |
About Us:
We specialized in researching, developing and servicing electric motors, gearbox and high precision gears with small modules. After years of development, we have an independent product design and R&D team, service team and professional quality control team.
What's more, we have two joint ventures. One is located in Changzhou, which produces hybrid stepper motor, precious linear stepper motor,
brushless DC motor, servo motor, stepper motor driver, brushless motor driver, encoder and brake. Another one is located in Shenzhen, which produces DC gear motor. The factory has dozens of CNC machines and high precision test equipment, implements the process management and automatic operation in most producing process.
Package:
Related Products:
FAQ:
Q: How about the Sample order?
A: Sample is available for you. please contact us for details.
Q: Which shipping way is available?
A: DHL, UPS, FedEx, TNT, EMS, China Post, Sea are available. The other shipping ways are also available, please contact us if you need ship by the other shipping way.
Q: How long is the delivery time?
A: Delivery time depends on the quantity you order. usually, it takes 30-45 working days.